As advancements are continually made in the area of mud motor performance, single run laterals in the Bakken are becoming more and more common. Newsco prides itself on utilizing optimal rotor / stator fit and clear operating instructions to ensure optimal mud mo-tor performance from drill out all the way to Total Depth.
Operator: Whiting Petroleum
Location: Williams County, ND
Well Name: Truax Field
Formation: Bakken (Shale)
Well Type: Horizontal
Hole Size: 6"
Total Depth: 20,349 feet
Average Rotary ROP: 326.26 ft/hr
Average Slide ROP: 65.95 ft/hr
Flow Rate: 288-300 gpm
Mud System: 9.7 ppg Brine
Drilling Hours: 36.58 hours
Circulating Hours: 38.35 hours
Footage Drilled: 9,094 feet
Temperature: 281°F
Services Performed: Newsco Performance Mud Motor
Contact your Newsco Account Manager for more information:
3101 Wood Court
Casper, WY 82601
Phone: 1-307-232-6336
clae.bilek@newsco-drilling.com